RB Solutions

Process engineering design, calculated and verified

RB Solutions is a scientific and process engineering design consultancy. It turns a process requirement into a basis of design, a mass balance, drawings and equipment sizes calculated from first principles and validated before issue.

Illustrative piping and instrumentation diagram Raw water tank, feed pump, flow-paced coagulant dosing controlled by PLC, static mixer, flocculation tank, lamella clarifier with sludge pump, filter feed pump, pressure filter with relief valve and differential pressure transmitter, and treated water tank, with numbered streams, a stream table and a title block. T-101Raw watertank Drain P-101A P-101B Feed pumps, duty and standby T-201Coagulant P-201 M-101 Static mixer M FL-101 Flocculation tank CL-101Lamella clarifier P-102 Sludge pump P-103 Filter feed pump F-101Pressurefilter T-102Treatedwater tank Drain C1A1 FIT105 FIC105 FC FV-105 FIT101 LT101 PT101 FIT102 FY102 AIT101 pH AIT102 Turbidity PSV-101 To drain PDT101 LT103 150-RW-101-A1 100-RW-102-A1 15-CD-201-C1 100-RW-103-A1 100-CW-101-A1 50-SL-101-A1 100-FW-101-A1 100-TW-101-A1 50 m³/h each 10 L/h 49 m³/h 1 m³/h Legend Process line Minor process line Electrical signal Isolation valve Check valve Control valve, FC Field instrument PLC function Stream number Centrifugal pump Relief valve Specification break 1 2 3 4 5 6 7 8 9 From source To sludge treatment To supply Stream 1 2 3 4 5 6 7 8 9 Description Raw water Pumped feed Coagulant Dosed feed Flocculated Clarified Sludge Filtered Treated Flow, m³/h 50.0 50.0 0.01 50.0 50.0 49.0 1.0 49.0 49.0 Line size, DN 150 100 15 100 150 100 50 100 100 Velocity, m/s 0.79 1.77 0.02 1.77 0.79 1.73 0.14 1.73 1.73 Line number 150-RW-101-A1 100-RW-102-A1 15-CD-201-C1 100-RW-103-A1 150-RW-104-A1 100-CW-101-A1 50-SL-101-A1 100-FW-101-A1 100-TW-101-A1 Notes 1. Illustrative design basis 50 m³/h; sludge 1 m³/h; coagulant 10 L/h. 2. Velocity: suction and gravity ≤ 1.0 m/s; pumped discharge 1.0 to 2.0 m/s. 3. Sludge lines DN50 minimum. 4. Dosing lines DN15 minimum. 5. Pump suction DN150. Velocities on nominal bore. 6. Line number: DN, service, sequence, specification. Clarification and filtrationPiping and instrumentation diagram, illustrative RB Solutions LtdTel. +44 1278 258021 Drawing no.RBS-PID-001 Issue001 Illustrative piping and instrumentation diagram, portrait view 1 From source FIT101 150-RW-101-A1 T-101 Raw water tank LT101 P-101A P-101B standby 50 m³/h PT101 FIT102 2 100-RW-102-A1 T-201 Coagulant P-201 10 L/h 3 15-CD-201-C1 M-101 Static mixer AIT101 pH 4 M FL-101 Flocculation tank 5 CL-101 Lamella clarifier 6 P-103 49 m³/h 100-CW-101-A1 PSV-101 To drain 7 To sludge treatment P-102 1 m³/h F-101 Pressure filter PDT101 8 100-FW-101-A1 T-102 Treated water tank LT103 FIT105 FIC105 FV-105 Fail closed 9 100-TW-101-A1 To supply No. Description m³/h DN m/s Line number 1 Raw water 50.0 150 0.79 150-RW-101-A1 2 Pumped feed 50.0 100 1.77 100-RW-102-A1 3 Coagulant 0.01 15 0.02 15-CD-201-C1 4 Dosed feed 50.0 100 1.77 100-RW-103-A1 5 Flocculated 50.0 150 0.79 150-RW-104-A1 6 Clarified 49.0 100 1.73 100-CW-101-A1 7 Sludge 1.0 50 0.14 50-SL-101-A1 8 Filtered 49.0 100 1.73 100-FW-101-A1 9 Treated 49.0 100 1.73 100-TW-101-A1 Design basis 50 m³/h. Suction and gravity lines ≤ 1.0 m/s; pumped lines 1.0 to 2.0 m/s. Sludge DN50 and dosing DN15 minimum. Clarification and filtration P&ID, illustrative Drawing no. RBS-PID-001 RB Solutions Ltd Issue 001
Illustrative P&ID, clarification and filtrationEvery issued design carries a mass balance for each numbered stream

Engineering design services

RB Solutions provides design and consultancy only, with no equipment to sell. Each recommendation is made for the process, not for a product range, so clients, contractors and equipment suppliers can rely on it as an independent design.

  • Process design and basis of design

    Design flows, loads, consent limits and operating cases set out as one agreed basis, with every value traced to its source.

  • Mass and energy balances

    Stream-by-stream balances for normal, peak and minimum cases, issued with closure checks on water, solids and heat.

  • PFD creation

    Process flow diagrams to BS EN ISO 10628-2, drawn from the mass balance, with stream tables, equipment lists and design conditions on the sheet.

  • P&ID creation

    Piping and instrumentation diagrams with ISA-5.1 instrument loops, valve and actuator fail positions, line numbering, specification breaks, relief and safeguarding.

  • Live P&ID

    A browser-based P&ID linked to the design calculation, so line sizes, duties and stream data update when the design changes and every party works from one current drawing.

  • P&ID process assessment

    Existing P&IDs assessed for continuity, control, isolation, relief and safeguarding, with findings ready for HAZOP and for correction before issue.

  • 3D plant design

    3D plant models built from the client P&ID: equipment, pipe routes, access platforms and maintenance envelopes, with clash checks before fabrication.

  • Engineering drawing creation

    General arrangements, sections, elevations, tank and skid details and pipework drawings to BS EN ISO 128 and BS EN ISO 5457, under document control.

  • Plan views and layouts

    Plan and general arrangement views of plant, tanks, skids and pipe routes, coordinated with the P&ID for access, maintenance and lifting.

  • Tender support documentation

    Process descriptions, functional design specifications, equipment datasheets, technical schedules and tender returns prepared for clients and contractors.

  • Pricing support

    Capital and operating cost estimates, equipment and material take-offs, budget enquiries to suppliers and priced schedules for tender submissions.

  • Equipment and hydraulic sizing

    Tanks, pumps, clarifiers, filters, mixers, weirs, launders and pipework sized from the balance, with the governing criterion stated.

  • Water and effluent treatment design

    Potable water, wastewater and industrial effluent: lamella clarifier, MBBR, SBR, precipitation, pH correction and filtration process design.

  • Design review and verification

    Independent review of vendor proposals and third-party designs, with each calculation repeated by a second method.

  • Feasibility and options studies

    Treatment routes compared on performance, footprint, operating cost and risk, leading to a clear recommended option.

  • CFD modelling

    Computational fluid dynamics of tanks, clarifiers, mixers, inlets, launders and pipe networks: single and multiphase flow (gas–liquid aeration, solid–liquid settling, free surface), turbulence, heat transfer, particle tracking, non-Newtonian sludge rheology, short-circuiting and residence time distribution, validated against first-principles hydraulics.

  • DSEAR assessments

    Risk assessment under the Dangerous Substances and Explosive Atmospheres Regulations 2002: hazardous area classification to BS EN IEC 60079-10-1 and 60079-10-2, release and ventilation assessment, zone drawings and equipment category selection.

  • Thermal analysis

    Heat and energy balances, heat exchanger and chiller sizing, heat loss and insulation, trace heating and frost protection, and transient heating and cooling of tanks and process streams.

  • Process simulation

    Steady-state and dynamic simulation of treatment trains, control loops, tank levels and dosing, used to test operating cases, start-up and upset conditions before construction.

  • Hand calculations

    Independent hand calculations and check calculations, set out step by step with sources and units, to verify software output, vendor figures and third-party designs.

  • Technical reports

    Design reports, calculation packages, basis of design documents and technical notes written for clients, regulators and independent reviewers.

  • Scientific studies

    Literature reviews, treatability and bench studies, water chemistry and solubility modelling, reaction kinetics, gas transfer, heat transfer and statistical analysis of site data.

From enquiry to issued design

  1. Scope and fixed fee

    Deliverables are listed and priced as a fixed fee before work begins.

  2. Basis of design

    Flows, qualities and limits are agreed in writing with the client.

  3. Calculation

    One calculation record produces every figure used in the design.

  4. Drawings

    PFDs, P&IDs and datasheets are generated from that record.

  5. Verification and issue

    Figures are checked by a second method, then issued under document control.

First-principles calculation and validation

Calculations start from conservation of mass, energy and momentum, chemical equilibrium, reaction kinetics and transport phenomena. Rules of thumb and vendor figures are used only to check the result, never to replace it.

Conservation laws first

Every design is built on closed mass and energy balances, with each stream accounted for and closure checked before any equipment is sized.

Governing physics and chemistry

Sizing follows from the governing equations: settling velocity, head loss, gas transfer, solubility and reaction rate, not from catalogue selection.

Dimensional and unit checks

Every equation is checked for dimensional consistency and every value carries its units through the calculation.

Range of validity

Each correlation is used only inside the conditions it was derived for, such as Reynolds number, concentration and temperature, and the check is recorded.

Independent second method

Each governing quantity is calculated twice by different routes and must agree within a stated tolerance before issue.

Sourced inputs

Design parameters carry their reference: standard, published paper or measured site data. Nothing is assumed silently.

Drawings follow the calculation

When a figure changes, the calculation is rerun and the drawings are reissued from it, so text and drawings cannot disagree.

Sensitivity and uncertainty

Design inputs are varied across their credible range and the effect on each governing quantity is reported, so margins are stated rather than assumed.

Validation against benchmarks

Results are compared with published data, operating plant and independent figures, and any difference is explained before issue.

Controlled documents

Deliverables are numbered, reviewed and approved under document control aligned to ISO 9001:2015.

Sectors served

  • Municipal water and wastewater treatment
  • Industrial effluent and metal finishing
  • Food and drink processing
  • Mineral processing
  • Utilities and infrastructure
  • Aquaculture and recirculating water systems

UK design basis

UK sites are designed to UK legislation, British Standards and water industry specifications. Each design states which apply.

UK regulations and standards applied

Drinking water

SI 2016/614
Water Supply (Water Quality) Regulations 2016, England
SI 2018/647
Water Supply (Water Quality) Regulations 2018, Wales
SSI 2014/364
Public Water Supplies (Scotland) Regulations 2014
SR 2017/212
Water Supply (Water Quality) Regulations (Northern Ireland) 2017
SI 2016/618
Private Water Supplies (England) Regulations 2016
Regulation 31
DWI approval of products and chemicals in contact with drinking water
SI 1999/1148
Water Supply (Water Fittings) Regulations 1999
BS EN 805
Water supply systems and components outside buildings
BS EN 1508
Water supply storage systems and components
BS EN 806, BS 8558
Installations conveying water for human consumption
BS EN 1717
Protection against pollution of potable water by backflow
ACOP L8, HSG274
Control of legionella bacteria in water systems

Wastewater and effluent

SI 1994/2841
Urban Waste Water Treatment (England and Wales) Regulations 1994
SI 2016/1154
Environmental Permitting (England and Wales) Regulations 2016
Water Industry Act 1991
Trade effluent discharge to public sewer
Water Resources Act 1991
Controlled waters and discharge consents
BS EN 12255
Wastewater treatment plants
BS EN 752
Drain and sewer systems outside buildings
BS EN 12566
Small wastewater treatment systems

Safety and equipment

SI 2015/51
Construction (Design and Management) Regulations 2015
SI 2002/2776
Dangerous Substances and Explosive Atmospheres Regulations 2002
SI 2002/2677
Control of Substances Hazardous to Health Regulations 2002
SI 2016/1105
Pressure Equipment (Safety) Regulations 2016
SI 2008/1597
Supply of Machinery (Safety) Regulations 2008
BS EN IEC 60079-10-1, -10-2
Classification of explosive gas and dust atmospheres
BS EN ISO 12100
Risk assessment and risk reduction
BS EN 61511
Functional safety, safety instrumented systems
BS EN 60204-1
Electrical equipment of industrial installations

Drawings and documents

BS EN ISO 10628-2
Graphical symbols for PFDs and P&IDs
ISA-5.1, BS ISO 3511
Instrument identification and symbols
BS EN ISO 7200
Title blocks
BS EN ISO 5457
Drawing sheet sizes and layout
BS EN ISO 128
Technical drawing presentation
BS EN IEC 81346
Reference designation of plant
WIMES
Water Industry Mechanical and Electrical Specifications
CESWI
Civil Engineering Specification for the Water Industry
ISO 9001:2015
Document control alignment

Common questions

What does RB Solutions provide?

RB Solutions provides scientific and process engineering design services only: basis of design, mass and energy balances, process flow diagrams, P&IDs, equipment and hydraulic sizing, design review and feasibility studies. It does not supply equipment.

How are engineering calculations verified?

Each design figure is produced by a calculation that writes its results to a single record, and is then checked by an independent second method with a stated tolerance. Units, input consistency and range of validity are checked before any figure is issued.

Which standards are drawings produced to?

Process flow diagrams and P&IDs follow BS EN ISO 10628-2 graphical symbols, with instrument identification to ISA-5.1 and ISO 3511. UK sites are designed to UK legislation and BS EN standards.

How is a project priced?

Work is quoted as a fixed fee against a written scope of deliverables. Any additional work is priced and agreed before it starts. Prices are quoted excluding VAT.

Can RB Solutions review a vendor proposal?

Yes. Vendor process proposals are checked against the basis of design, recognised design guidance and an independent calculation, and the findings are issued as a formal review with each item traced to its source.

Discuss a project

Send a description of the process, design flows and any existing drawings. A written scope and fixed fee follow.